SI-13(4) Standby Component Installation and Notification

Control enhancement of SI-13 Predictable Failure Prevention

Control

If system component failures are detected:

(a)

Ensure that the standby components are successfully and transparently installed within [Assignment: time period] ; and

(b)

[Assignment: Selection (one-or-more): activate [si-13.04_odp.03] | automatically shut down the system | [si-13.04_odp.04] ].

Discussion

Automatic or manual transfer of components from standby to active mode can occur upon the detection of component failures.

Need SI-13(4) implemented and evidenced?

We assess where you stand against this control, document the gap, and build the remediation plan your auditor and your board will both accept.

Request an assessment

Control catalog and framework text on this page is reproduced from official NIST publications — a public-domain work of the U.S. Government (17 U.S.C. §105). Maverc commentary, groupings, and readiness guidance are our own and are not part of any NIST publication.