PE-11(2) Alternate Power Supply — Self-contained
Control enhancement of PE-11 Emergency Power
Control
Provide an alternate power supply for the system that is activated [Assignment: Selection: manually | automatically] and that is:
Self-contained;
Not reliant on external power generation; and
Capable of maintaining [Assignment: Selection: minimally required operational capability | full operational capability] in the event of an extended loss of the primary power source.
Discussion
The provision of a long-term, self-contained power supply can be satisfied by using one or more generators with sufficient capacity to meet the needs of the organization.
Need PE-11(2) implemented and evidenced?
We assess where you stand against this control, document the gap, and build the remediation plan your auditor and your board will both accept.
Control catalog and framework text on this page is reproduced from official NIST publications — a public-domain work of the U.S. Government (17 U.S.C. §105). Maverc commentary, groupings, and readiness guidance are our own and are not part of any NIST publication.
