Control
Perform preventive maintenance on [Assignment: system components] at [Assignment: time intervals].
Discussion
Preventive maintenance includes proactive care and the servicing of system components to maintain organizational equipment and facilities in satisfactory operating condition. Such maintenance provides for the systematic inspection, tests, measurements, adjustments, parts replacement, detection, and correction of incipient failures either before they occur or before they develop into major defects. The primary goal of preventive maintenance is to avoid or mitigate the consequences of equipment failures. Preventive maintenance is designed to preserve and restore equipment reliability by replacing worn components before they fail. Methods of determining what preventive (or other) failure management policies to apply include original equipment manufacturer recommendations; statistical failure records; expert opinion; maintenance that has already been conducted on similar equipment; requirements of codes, laws, or regulations within a jurisdiction; or measured values and performance indications.
Need MA-6(1) implemented and evidenced?
We assess where you stand against this control, document the gap, and build the remediation plan your auditor and your board will both accept.
Control catalog and framework text on this page is reproduced from official NIST publications — a public-domain work of the U.S. Government (17 U.S.C. §105). Maverc commentary, groupings, and readiness guidance are our own and are not part of any NIST publication.
